Description
Eliminate months of lead time on your next early production facility.
This Roska solution is an industry first: a ready-to-go, highly portable package with an integrated vapour recovery unit. The Chameleon 2500TM enables the producer to bring high-rate, multi-phase wells (gas, oil, NGL) on-stream quickly and cost-efficiently. Driven by a market need to bring on early production from a single or multi-well site with trucked-out oil production. The Chameleon 2500TM fulfills these needs while meeting today’s tighter restrictions on flaring and venting. The Chameleon 2500TM brings together on a single skid what previously took 5-6 pieces, each requiring sourcing, engineering, transport and field assembly.
This ready-to-go solution is well-suited to exploration well pads in high-rate unconventional plays such as the Duvernay and Montney.
See attached specification sheet for more details.
CB04 Chameleon 2500 Spec Sheet
Sweet/Sour Specification on Major Equipment
Compressor | Level 2 Sour (Greater than 2% H2S) |
Vessels | Sour |
Piping | Sour |
Coolers | Sour |