Field Gas Processing
Roska DBO’s temporary gas processing facility is back from a previous assignment and available for immediate rental. This facility is ideal for evaluating exploratory wells and can capture the information you need to understand your reservoir and plan the future of your development.
Able to produce raw field gas into a spec pipeline, our facility can be brought online in as little as 10 weeks – with minimal capital investment.
Showing 1–12 of 13 results
-
R126 – Horizontal 3-Phase 48″ x 30′ @ 2000 PSI Separator
-
CB12 Gemini Natural Gas 1085 HP Compressor
-
GS02 – 300kW Natural Gas Power Generator with 300kw Diesel backup
-
LPG01- 164m3/1029 bbl (129″ x 60′ S/S) Pressurized Storage Tank
-
DH01 – 36″ x 34′, 1415 psig Contactor Tower Gas Dehydration Package
-
400 Barrel Storage Tank, 12′ diameter x 20′ high (Quantity 28 Available)
-
MCC01 – Mechanical Control Centre
-
PUM001 – 7.5HP Grundfos Centrifugal Electric Pump
-
MS01 – 600# Meter Skid
-
FKO07 – 108″ x 37′ S/S Flare Knockout Drum
-
PUM002 – 20HP Hydracell Diaphgragm Electric Pump
-
ACB01 – 2 X 10 HP, 2 x 28 ACFM @ 130 PSI Hydrovane Instrument Air Package
Showing 1–12 of 13 results